Case Studies...

Project Integration, Inc. provides total solutions to the industrial community to meet environmental, energy, safety, and process support needs. The following Case Studies depict some of the solutions implemented.

 

Power Systems Company

Completed an initial facility environmental gap analysis.  Identified and closed compliance gaps.  Developed an environmental and safety compliance management program and provide on-going environmental compliance management and safety program development and training for the company’s five (5) facilities located in PA, TX, CA, SC, and IL.  The program includes:

Specialty Wire Manufacturer – Hazardous Waste Delisting

Completed F006 hazardous waste delisting for a specialty wire manufacturer.  The facility had previously been granted a delisting and had it revoked.  Therefore, regulatory interaction and input was essential.  The major phases of the project included:

 

Flat Glass Facility Air Emissions Control System

Designed, built, and installed an emission control system for a coating system to control halogenated hydrocarbon emissions and recover valuable by-products. The system included:

 

Secondary Aluminum Facility

Provide environmental compliance and process safety management support for the integrated aluminum facility.  The compliance areas of assistance include:

 

Tier 1 Automotive Supplier – Hazardous Waste Delisting

Completed F006 hazardous waste delisting for a Tier 1 automotive supplier.  The major phases of the project included:

 

Chemical Manufacturing Facility -

Provided the environmental permitting, mechanical, piping, and utility design and construction oversight for a chemical manufacturing facility in North Carolina. Have since provided on-going environmental compliance support.  The programs, systems and equipment developed, designed and specified included:

 

Secondary Aluminum Facility - Chlorine Injection System

Provided the design and construction oversight for a chlorine gas injection system in the cast house of a major aluminum supplier. The system was designed to deliver, control, and inject chlorine gas into aluminum furnaces for removal of impurities. The key elements of the project included: